Installation - NEC UNIVERGE SV8100 System Hardware Manual

Hide thumbs Also See for UNIVERGE SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
System Hardware Manual
Two Blade status LEDs
Two straps and one switch per circuit to determine the circuit type
Limitation depends on the connecting Router,
Multiplexer or Exchange. If the UNIVERGE
SV8100 is connected to another UNIVERGE
SV8100 directly, there is up to 1,500 ohms loop
resistance (including system).
Table 4-51 CD-4ODTB Maximum Upgrade Capacities
maximum capacities for the ODT blades when they are upgraded.
Table 4-51 CD-4ODTB Maximum Upgrade Capacities
19" Chassis
with CPU
5
5.7.2

Installation

1.
Set the straps for either the 2-wire or 4-wire. Refer to
4-32 CD-4ODTB Blade on page
2.
Install the CD-4ODTB into a slot in the chassis.
19" Chassis
19" Chassis
without CPU
6
When a router or multiplexer is connected
instead of a trunk, the SG terminal of the router
or multiplexer must be connected to the FG
grounding terminal on the UNIVERGE
SV8100 chassis. When a tie line trunk is
connected, the FG terminal must be connected
to the ground. If the FG terminal is not
connected correctly, the signal may fail.
When tie lines are connected to the system, be
careful of the Tip and Ring polarity.
Issue 5.0
provides the
Networked
x4
Chassis
23
50
4-94.
Figure
4 - 95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents