3. Disassembly & Reassembly Procedures
a.
This section describes the procedures required to exchange line replaceable units.
Whenever a unit is replaced, mechanical and functional testing as described in Section 2 must be
completed.
b.
It is recommended that the 3004-0055 F3 COMPACT service tool kit be used to conduct
disassembly and reassembly procedures. The tool kit contains the following:
Pull-through for coil cable
Flat blade screwdriver
3mm hex key driver
2.5mm hex key driver
2mm hex key driver
T20 Torx driver
18mm spanner
13mm spanner
10mm spanner
3mm pin punch
Screwdriver Pozidrive No 1
Screwdriver Pozidrive No 2
Tube Spanner 7/8
Silicone grease
13
F3 COMPACT Service Manual