Linhai ATV 260 Service Manual page 303

Hide thumbs Also See for ATV 260:
Table of Contents

Advertisement

CHAPTER 8 ELECTRICAL
CHARGING SYSTEM
Procedure
Check:
1. Fuse (Main)
2. Battery
3.Charging voltage
1. fuse
2. Battery
Check the battery condition.
Refer to "BATTERY INSPECTION"
3.Charging voltage
Connect the engine tachometer
to the spark plug lead.
Connect
the
(DC20V) to the battery
Test (+) lead→
Battery (+) terminal
Tester (-) lead→
Battery (-) terminal
Measure
the
voltage.
start the engine and accelerate to
about 5,000rpm
check the terminal voltage
Measured voltage-terminal
Voltage:
0.2-2.5V up
NOTE: Use a fully changed battery.
OUT OF SPECICATION
pocket
tester
battery
terminal
ATV SERVICE MANUAL 07.0
4.Stator coil resistance
5.Wiring system (entire charging system)
NO CONTINUITY
Replace the fuse
INCORRECT
Clean battery terminals
Recharge or replace the battery
MEETS SPECITICATION
The charging circuit is not faulty
Replace the battery
CHAPTER 8 ELECTRICAL CTRICAL PAGE 8- 14

Advertisement

Table of Contents
loading

Table of Contents