Linhai ATV 260 Service Manual page 272

Hide thumbs Also See for ATV 260:
Table of Contents

Advertisement

CHAPTER 6 TRANSMISSION
6. Install new front ( only for 4X4) and rear
output shaft seals.
7. Install pinion shaft with bearing .
8. Install retainer plate with flat side toward
bearing.
TM
9. Apply Loctite
and torque screws to 8 ft-lb. (12Nm).
10. Assemble shafts with chain and shift forks.
11. Carefully
install
assembly and gear cluster as a unit into
their respective bearing case areas. Tap
with a soft face hammer to seat shaft
assemblies.
NOTE
: Make sure shift shaft pins are
properly positioned in the slot on selector
arms.
NOTE
: Be sure gear indicator switch(es)
are removed from transmission case
before installing shafts.
12. Install output shaft and gear assembly
242(Blue) to screw threads
high/reverse
shaft
CHAPTER 6
ATV SERVICE MANUAL 07.0
TRANSMISSION
PAGE. 6- 11

Advertisement

Table of Contents
loading

Table of Contents