Genie Z-45/25 Service Manual page 32

Hide thumbs Also See for Z-45/25:
Table of Contents

Advertisement

Section 4 • Scheduled Maintenance Procedures
Maintenance Symbols Legend
The following symbols have been
used in this manual to help
communicate the intent of the
instructions. When one or more of
the symbols appear at the
beginning of a maintenance
procedure, it conveys the meaning
below.
Indicates that tools will be required to
perform this procedure.
Indicates that new parts will be required
to perform this procedure.
Indicates that a cold engine will be
required to perform this procedure.
Indicates that a warm engine will be
required to perform this procedure.
Indicates that dealer service is required
to perform this procedure.
4 - 2
Maintenance Schedule
There are five types of maintenance inspections
that must be performed according to a schedule—
daily, quarterly, six months, annual, and two years.
The Scheduled Maintenance Procedures Section
and the Maintenance Inspection Report have been
divided into five subsections—A, B, C, D and E.
Use the following chart to determine which
group(s) of procedures are required to perform a
scheduled inspection.
Inspection
Daily or every 8 hours
Quarterly or every 250 hours
Six months or every 500 hours
Annual or every 1000 hours
Two years or every 2000 hours
Maintenance Inspection Report
The maintenance inspection report contains
checklists for each type of scheduled inspection.
Make copies of the Maintenance Inspection Report
to use for each inspection. Store completed forms
for three years.
Genie Z-45/25 & Genie Z-45/25J
First Edition • Second Printing
Table or Checklist
A + B + C
A + B + C + D
A + B + C + D + E
Part No. 52709
A
A + B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents