Page 2
107713 Rev B July 2011 http://www.genieindustries.com First Edition, Second Printing e-mail: awp.techpub@terex.com "Genie" and "Z" are registered trademarks of Genie Industries in the USA and many other countries. Printed on recycled paper Printed in U.S.A. Self-Propelled Servicing Platform Part No. 107713...
41.6 liters Drive hubs 23 fl oz 0.68 liter For operational specifications, refer to the Operator's Manual. Continuous improvement of our products is a Genie policy. Product specifications are subject to change without notice. Self-Propelled Servicing Platform Part No. 107713...
25 psi / 1.7 bar bypass Chevron Rykon MV oil is fully compatible and mixable with Shell Donax TG (Dexron III) oils. Function manifold Genie specifications require hydraulic oils which are designed to give maximum protection to hydraulic Function relief valve pressure 3200 psi systems, have the ability to perform over a wide 220.6 bar...
Page 7
Service Manual Supplement January 2006 SPECIFICATIONS REV A Kubota Z482-E Engine Injection system Injection pump make Bocsh MD Displacement 29.23 cu in 0.48 liters Injection timing 21° BTDC Number of cylinders Injection pump pressure 1991 psi 137 bar Bore and stroke 2.64 x 2.68 inches 67 x 68 mm Fuel requirement...
O-rings. or when new hoses or fittings are installed. They are not standard SAE size O-rings. They are available in the O-ring field service kit (Genie part SAE O-ring Boss Port number 49612). (tube fitting - installed into Aluminum) 2 Lubricate the O-ring before installation.
Page 9
Service Manual Supplement January 2006 This page intentionally left blank. Self-Propelled Servicing Platform Part No. 107713...
Service Manual Supplement November 2011 Scheduled Maintenance Procedure About This Section This section contains detailed procedures for each scheduled maintenance inspection. Each procedure includes a description, safety warnings and step-by-step instructions. Observe and Obey: Symbols Legend Safety alert symbol—used to alert Maintenance inspections shall be completed by a personnel to potential personal person trained and qualified on the maintenance...
Service Manual Supplement November 2011 Maintenance Inspection Report Refer to the Genie Z-45/25 Bi-Energy & Z-45/25J Bi-Energy Service Model Manual for scheduled machine maintenance procedures. Serial number The following scheduled maintenance procedure will need to be performed every 1000 hours or annually in addition to regularly...
Note: Do not turn the machine off before removing the jumper from the back of the display. If the Note: Genie specifications require that this machine is turned off before the jumper wire is procedure be performed every 1000 hours of removed, all data may not save completely or operation or yearly.
Page 13
TYPE - Allows the choice of thermocouple being 6 Press the blank (unmarked) button to cycle used. Genie uses Type K thermocouples. through available choices for each menu item. 7 Press the button to make your choice and CJC - Cold Junction Compensation.
Page 14
Service Manual Supplement July 2011 REV B MAINTENANCE PROCEDURE How to Calibrate the 5 Use a precision DC voltage power supply with an output range of -10 mV DC to 60 mV DC and Temperature Sensor Voltage an accuracy of 0.03% or better. Connect the Input positive and negative leads of the power supply to the...
Page 15
Service Manual Supplement July 2011 MAINTENANCE PROCEDURE REV B 12 Exit the programming mode by removing the jumper wire from the back of the temperature display. Result: The display will show to indicate the SAVE programming changes are being saved into memory.
Page 16
Note: Genie programs a default value of +30° F / - 1.1° C for temperature offset. 1 See How to Program the Temperature Display and access the menu item.
Page 17
Service Manual Supplement July 2011 This page intentionally left blank. Self-Propelled Servicing Platform Part No. 107713...
Read, understand and obey the safety rules an imminently hazardous situation and operating instructions in the which, if not avoided, will result in Genie Z-45/25 Bi-Energy & Genie Z-45/25J death or serious injury. Bi-Energy Operator’s Manual on your machine. Used to indicate the presence of a...
Service Manual Supplement November 2011 Steer Axle Components REV B Yoke and Hub 2 Loosen the wheel lug nuts. Do not remove them. 3 Block the non-steer wheels, and then center a How to Remove the Yoke lifting jack of ample capacity under the steer axle.
Page 20
Service Manual Supplement November 2011 REV B STEERING AXLE COMPONENTS How to Remove the How to Install the Hub and Bearings Hub and Bearings 1 Loosen the wheel lug nuts. Do not remove Note: When replacing a wheel bearing, both the them.
Service Manual Supplement November 2011 STEERING AXLE COMPONENTS REV B Steer Cylinders Tie Rod How to Remove a Steer Cylinder How to Remove the Tie Rod There are two identical steer cylinders that 1 Remove the cotter pins from the clevis pins at work in parallel.
Service Manual Supplement July 2011 Non-steer Axle Components REV B Drive Motor Torque Hub How to Remove a Drive Motor How to Remove a Drive Torque Hub 1 Disconnect the battery packs. Note: The drive motor must be removed in order to 2 Remove the fasteners from the cover on the non- access the torque hub mounting bolts.
Page 23
Service Manual Supplement July 2011 NON-STEER AXLE COMPONENTS REV B 7 Place a second lifting jack under the torque hub for support. Secure the torque hub to the lifting jack. 8 Remove the torque hub mounting bolts that attach the torque hub to the non-steer axle. 9 Remove the torque hub from the machine.
Service Manual Supplement July 2011 Fiberglass Covers REV A Repair or Replacement of a Fiberglass Cover Repair: Minor damage, including small holes, cracks and chips in a fiberglass cover may be repaired by a qualified repair facility. Replacement: Replacement of a fiberglass cover when the structural integrity has been compromised due to excessive damage is required.
Page 25
July 2011 This page intentionally left blank. Self-Propelled Servicing Platform Part No. 107713...
November 2011 Service Manual Supplement REV C Platform Control Box Switch Panel Wiring Diagram LVI/BCI Options COMPONENT INDEX PLATFORM CONTROL BOX BATTERY CHARGE INDICATOR OR/RD ROTARY FLOW CONTROL DIAL WH P24 BAT DRIVE JOYSTICK CR51 OR/BK DRIVE ENABLE LED OR/RD LOAD SENSE LED RESET IS SET TO "B", LOW VOLTAGE INTERRUPT MODULE...
Page 37
November 2011 Service Manual Supplement Platform Control Box Switch Panel Wiring Diagram LVI/BCI Options...
November 2011 Service Manual Supplement REV C Power Cable Diagram TO ENGINE PANEL TO GROUND CONTROL BOX CONNECTOR C6 AC POWER CABLE LEFT SIDE DC AMMETER CABLE BATTERY PACK RIGHT SIDE RD-2GA BATTERY PACK ALTERNATOR BATTERY CHARGER PRIMARY RD-2GA LIFT PUMP AUXILIARY LIFT PUMP...
Page 41
November 2011 Service Manual Supplement Power Cable Diagram...