Genie Z-45/25 Service Manual page 109

Hide thumbs Also See for Z-45/25:
Table of Contents

Advertisement

First Edition • Second Printing
14 Pack both bearings with clean, fresh grease.
15 Place the large inner bearing into the rear of the
hub.
16 Install a new bearing grease seal into the hub
by pressing it evenly into the hub until it is flush.
Always replace the bearing grease
seal when removing the hub.
17 Slide the hub onto the yoke spindle.
Component damage hazard. Do
not apply excessive force or
damage to the lip of the seal may
occur.
18 Place the outer bearing into the hub.
19 Install the washer and castle nut.
20 Tighten the slotted nut to 35 ft-lbs (47 Nm) to
seat the bearings.
21 Loosen the castle nut, then re-tighten to
8 ft-lbs (11 Nm).
22 Install a new cotter pin. Bend the cotter pin
to lock it in.
23 Install the dust cap, then the tire and wheel
assembly. Torque the wheel lug nuts to
125 ft-lbs (169.5 Nm).
Part No. 52709
Section 4 • Scheduled Maintenance Procedures
Genie Z-45/25 & Genie Z-45/25J
TABLE E PROCEDURES
4 - 79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents