BRIDGE UNIT INSTALLATION
[A]
[E]
[B]
[D]
A688I402.WMF
[C]
B397I404.WMF
7. If an optional finisher is to be installed, attach two mylars [A] to the bridge unit.
8. Remove the cover [B].
9. Install the bridge unit [C] (! x2).
10. Connect the bridge unit I/F harnesses [D] (# x2).
11. Install the connector cover [E].
12. Turn on the main switch and check the bridge unit operation (make sure that
there are no paper jams).
SM
1-31
B003/B004/B006/B007