Honeywell Series A User Manual page 295

Fieldbus interface module
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

Step
7
Click the Continue button.
8
Click the Continue button.
9
Wait for Replacement Device Load
Confirmation dialog to appear. Click the
Continue button.
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
July 2010
8.1. Adding, Removing and Replacing Components
Action
Honeywell
8. Maintenance, Checkout, and Calibration
Result
If another Warning prompt appears, the
replacement device was previously
matched to another device and the
previous match will be undone, if you
continue.
Otherwise, go to the result in the next
Step.
Progress dialog appears to track the
status of the replacement.
Load Dialog for replacement device
appears. It is normal for an error code
(Err xxxx) to appear in the Current State
column for the blocks.
295

Advertisement

Table of Contents
loading

This manual is also suitable for:

Experion pks series a

Table of Contents