Siemens Pointek CLS200 Operating Instructions Manual page 29

Hide thumbs Also See for Pointek CLS200:
Table of Contents

Advertisement

Hazardous location cable entry: M20 (A5E03252528) and ½" NPT (A5E03252527)
1. Strip the cable to suit equipment and expose armour/braid.
2. Push the cable through the diaphragm shield/armour spigot (4). Pre-fitted cable guide (4.1)
can now be discarded. The diaphragm seal can be rolled back to ease assembly as required.
Spread armour/braid over the diaphragm seal/armour spigot (4) until the end of the
armour/braid is up against the shoulder of the armour cone. Position the armour clamping
ring (3).
3. Place the entry (5) and position over the diaphragm seal/armour spigot (4). Move the sub-
assembly (1) and (2) up to meet the entry (5).
4. Hold the entry (5) in position with a wrench to prevent rotation. Hand tighten the middle
nut (2) to the entry (5), and turn a further 1/2 to 3/4 turn with a wrench.
Note
Support the cable to prevent it from twisting. To ease the wiring inside the enclosure, it
may be beneficial to strip the inner sheath of the cable.
Pointek CLS200/CLS300 digital
Operating Instructions, 05/2021, A5E47904060-AA
Entry (with captive deluge seal)
Diaphragm seal/armour spigot
Reversible armour clamp
Middle nut
Back nut
Wiring
6.2 Cable entries
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pointek cls300

Table of Contents