Installation; Pointek Cls200; Handling Precautions - Siemens Pointek CLS200 Operating Instructions Manual

Hide thumbs Also See for Pointek CLS200:
Table of Contents

Advertisement

Installation

5.1

Pointek CLS200

Note
• Installation shall only be performed by qualified personnel and in accordance with local
governing regulations.
• This product is susceptible to electrostatic shock. Follow proper grounding procedures.
• The housing may only be opened for maintenance, local operation, or electrical
installation.
• Before installing the instrument, verify that the environment complies with any
restrictions specified on the product nameplate.
• To ensure compliance with CE EMC regulations, please install in accordance with the
testing details on Approvals (verify against product nameplate) in Approvals (Page 86).
5.1.1

Handling precautions

NOTICE
To prevent damage, all CLS200 units with a rod longer than 2 m (6.5 ft) must be handled as
described below.
When lifting CLS200 from a horizontal position, support it at these three points:
Pointek CLS200/CLS300 digital
Operating Instructions, 05/2021, A5E47904060-AA
At the process connection of flange
Midway along the rod
At the end of the rod before the sensor
5
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pointek cls300

Table of Contents