Suzuki Grand Vitara 2011 Manual page 712

Hide thumbs Also See for Grand Vitara 2011:
Table of Contents

Advertisement

1E-25 Engine Lubrication System: For F9Q Engine
Installation
1) Remove oil, old sealant and dust from mating
surface of upper oil pan, cylinder block and lower oil
pan.
2) Install new ventilation hose No.3 union bolt (1) to
upper oil pan (2), if necessary.
Tightening torque
Ventilation hose No.3 union bolt (a): 25 N·m (2.5
kgf-m, 18.5 lb-ft)
3) Install accessory belt idler (1) with base (2) to upper
oil pan (3), if removed.
Tightening torque
Idler base (a): 50 N·m (5.0 kgf-m, 36.5 lb-ft)
4) Install oil pan baffle plate (1), if removed.
Tightening torque
Oil pan baffle plate bolt (a): 24 N·m (2.4 kgf-m,
17.5 lb-ft)
2
1, "A", (a)
I5JB0B150018-03
2
1
3
I5JB0B150019-01
I5JB0B150020-01
5) Apply sealant to hatched part of cylinder block,
gasket holder plate and main bearing cap No.1 as
shown in figure.
"A": Thread lock cement (Loctite rhodorseal
5661®)
6) Install upper oil pan (1) to cylinder block with new
gasket, and tighten upper oil pan bolts evenly and
gradually in numerical order ("1" through "22") by
repeating tightening sequence two or three times
until specified torque is obtained.
Tightening torque
Upper oil pan bolt (a): Tighten 15 N⋅m (1.5 kgf-m,
11.0 lb-ft) by the specified procedure
"3"
"11"
"7"
"15"
"19"
"20"
"16"
"12"
"8"
"4"
(a), "1"
I5JB0B150022-01
"2"
"6"
"10"
"14"
"18"
"22"
"17"
"21"
"13"
"9"
"5"
I5JB0B150023-01

Advertisement

Table of Contents
loading

Table of Contents