Suzuki Grand Vitara 2011 Manual page 629

Hide thumbs Also See for Grand Vitara 2011:
Table of Contents

Advertisement

Tightening torque
Intercooler outlet pipe clamp: Tighten 5 N⋅m (0.5
kgf-m, 4.0 lb-ft) and 5 N⋅m (0.5 kgf-m, 4.0 lb-ft) after 5
minutes
Cylinder Head Cover Components
1. Cylinder head cover
2. Cylinder head cover bolt gasket
Cylinder Head Cover Removal and Installation
Removal
1) Disconnect CMP sensor connector (1).
1
2) Remove harness bracket and timing belt cover No.2
(1).
2
1
3. Cylinder head cover gasket
: Tighten 12 N⋅m (1.2 kgf-m, 9.0 lb-ft) by the specified procedure.
3) Remove air intake pipe (1) referring to "Air intake
S6JB0A1436048
Pipe Removal and Installation: For F9Q Engine".
4) Disconnect ventilation hose No.2 (2) from ventilation
pipe No.2 (3).
5) Disconnect ventilation hose No.3 (4) from oil vapor
recirculation valve (5).
6) Remove fuel injector cover (6).
I5JB0B140011-01
1
I5JB0B140012-01
Engine Mechanical: For F9Q Engine 1D-139
(a)
3
I5JB0B140010-01
5
4
3
2
6
S6JB0A1436047
: Do not reuse.
1
I6JB0A143002-01

Advertisement

Table of Contents
loading

Table of Contents