Mx10004 Site Preparation Checklist - Juniper MX10004 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX10004:
Table of Contents

Advertisement

MX10004 Site Preparation Checklist

The checklist in
Table 28 on page 80
MX10004 router.
Table 28: MX10004 Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as temperature
and humidity are within router tolerances.
Power
Measure the distance between external power sources
and the router installation site.
Calculate the power consumption and requirements.
Rack
Verify that your rack meets the minimum requirements
for router installation.
Plan rack location, including required space clearances for
optimal airflow.
Secure the rack to the floor and the building structure.
Cables
summarizes the tasks you must perform to prepare a site for the
For More Information
See
"MX10004 Environmental Requirements
and Specifications" on page
See
"MX10004 Power Planning" on page
See
"MX10004 Rack Requirements" on page
84.
See
"MX10004 Clearance Requirements for
Airflow and Hardware Maintenance" on page
87.
81.
88.
80

Advertisement

Table of Contents
loading

Table of Contents