Site Preparation Checklist For An Xre200 - Juniper XRE200 Hardware Manual

External routing engine
Hide thumbs Also See for XRE200:
Table of Contents

Advertisement

Site Preparation Checklist for an XRE200

The checklist in
Table 18 on page 47
an XRE200 External Routing Engine installation.
Table 18: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
external Routing Engine tolerances.
Power
Measure distance between external power
sources and external Routing Engine
installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of external
Routing Engines you want to install.
Rack or Cabinet
summarizes the tasks you need to perform when preparing a site for
For More Information
"Environmental Requirements and
Specifications for EX Series
Switches" on page 49
"Cables Connecting the XRE200
External Routing Engine to
XRE200 External Routing Engines
and EX8200 Switches" on page 60
"AC Power Specifications for
XRE200 External Routing Engines"
on page 37
"DC Power Specifications for an
XRE200 External Routing Engine"
on page 40
"XRE200 External Routing Engine
Hardware Overview" on page 17
Performed By
Date
47

Advertisement

Table of Contents
loading

Table of Contents