Correcting Leaks; Correcting Leaks (G7116B); Correcting Leaks (G1170A) - Agilent Technologies 1290 Infinity II 2D-LC User Manual

Solution for masshunter tof and q-tof
Hide thumbs Also See for 1290 Infinity II 2D-LC:
Table of Contents

Advertisement

12
Maintenance

Correcting Leaks

Correcting Leaks

Correcting Leaks (G7116B)

When
If a leakage has occurred at the heat exchanger or at the capillary connections or at the column
switching valve.
Tools required
Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)
1 Remove the door.
2 Use a pipette and tissue to dry the leak sensor area.
3 Observe the capillary connections and the column switching valve for leaks
4 Reinstall the door.

Correcting Leaks (G1170A)

When
If leakage has occured at the capillary connections or at the valve.
Tools required
Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)
1 Use a pipette and tissue to dry the leak sensor area.
2 Observe the capillary connections and the valve for leaks and correct, if
2D-LC User Guide
and correct, if required.
required.
323

Advertisement

Table of Contents
loading

This manual is also suitable for:

1290 infinity ii lc

Table of Contents