12.6 Commissioning report

Logano GE515 boilers can be operated with an oil or a
gas burner. During commissioning, carefully complete
the commissioning report for either the oil or gas burner.
Sign all commissioning work as completed and enter
the relevant date.
Commissioning work
1.
Fill the heating system with water
2.
Vent the heating system via radiators and air vents
3.
Leak test carried out?
4.
Check the location of the hot gas baffle plates
5.
Commission the control device
6.
Start up the burner
7.
Check the flue gas temperature
Inform the system user and hand over all relevant
8.
technical documentation
9.
Confirm professional commissioning
company stamp/signature/date
USER NOTE
Enter the fuel to be used into the table
(
operating instructions "Preamble",
page 2).
54
Page
(individual steps)
Page 50
Page 28
Page 51
Page 33
Page 51
Page 52
Logano GE515 - We reserve the right to make any changes due to technical modifications.
burner documentation
Comments
(signature)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents