Commissioning the heating system

7.18 Commissioning report

B Confirm commissioning as complete; sign and date the
report.
Commissioning tasks
1.
Fill the heating system and check for leaks
2.
Have the details regarding water quality in the operator's log
been observed?
- Levels of concentration of additives
3.
Record gas parameters: Wobbe index
4.
Check the gas pipe for tightness
– Vent gas line
5.
Create operating pressure
6.
Check the ventilation and extract air apertures and the flue
connection
7.
Check the system equipment level
8.
Commission the control unit and burner
9.
Adjust gas type if required
10. Record actual values:
- Draught
- Gross flue gas temperature t
- Air temperature t
L
- Net flue gas temperature t
- Carbon dioxide content (CO
Flue gas losses q
A
- CO value, free of air
11. Test the gas supply pressure
12. Check for leaks during operation
13. Function checks
– Check ionisation current
14. Install casing parts
15. Inform operator; hand over technical documentation
16. Correct commissioning by the installing contractor
17. Operator signature
Tab. 11 Commissioning report
38
Calorific value
A
- t
A
L
) or oxygen content (O
2
Page
Actual values
24
Additives:
_________
30
_________ kW/m³
_________ kW/m³
29
31
28
31
30
32
31
35
Full load
_______Pa
______ °C
______ °C
______ °C
)
_______ %
2
_______ %
_____ ppm
33
____________ mbar
36
36
____________ μA
37
37
Logano plus GB402 - Subject to technical modifications!
Comments
Yes:
Levels of
concentration:
_______%
Partial load
_______Pa
______ °C
______ °C
______ °C
_______ %
_______ %
_____ ppm
Signature:______________________
Signature:______________________

Hide quick links: