Commissioning

7.18 Commissioning report

▶ Confirm commissioning as complete; sign and date the report.
Commissioning steps
1.
Fill the heating system and check for leaks
2.
Have the details regarding water quality in the log been observed?
- Concentration of additives
3.
Record gas parameters: Wobbe index
Net calorific value
4.
Check the gas pipe for tightness
– Vent gas line
5.
Create operating pressure
6.
Check the ventilation and extract air apertures and the flue connection
7.
Check the system equipment level
8.
Commissioning the control unit and burner
9.
Adjust gas type if required
10.
Record actual values:
- Draught
- Gross flue gas temperature t
- Air temperature t
L
- Net flue gas temperature t
- Carbon dioxide content (CO
Flue gas losses q
A
- CO value, free of air
11.
Testing the gas supply pressure
12.
Checking for leaks during operation
13.
Function tests
– Checking the ionisation current
14.
Fitting sections of the casing
15.
Inform operator; hand over technical documentation
16.
Correct commissioning by the installing contractor
17.
User signature
Tab. 12 Commissioning report
28
A
- t
A
L
) or oxygen content (O
)
2
2
page
Measured values
18
Yes:
Additives:
Concentration:
_________
_______%
22
_________ kW/m³
_________ kW/m³
21
23
21
23
22
23
25
26
Full load
Partial load
______Pa
______Pa
______ °C
______ °C
______ °C
______ °C
______ °C
______ °C
______ %
______ %
______ %
______ %
_____ ppm
_____ ppm
24
____________ mbar
27
27
____________ μA
27
27
Signature:______________________
Signature:______________________
Logano plus GB402 – 6 720 804 428 (2012/09)