Buderus Logano GE515 Installation And Maintenance Instructions Manual page 41

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

Hook the front cover (Fig. 52, [1]) with both hooks
(Fig. 52, [3]) into the front side panels.
Secure the front cover with two self-tapping screws
(Fig. 52, [2]) from below with the longitudinal rails.
USER NOTE
Install the control unit, route the capillary
tubes to the sensor well and insert the
sensors into the well, before positioning
any other hood components
(
chapter 10 "Installing the control
device", page 46).
Slide the edges of the central boiler cover (Fig. 53,
[1]) underneath the front boiler cover and insert into
the flange of the side panels.
Locate the edges and the notch for the boiler flow of
the rear boiler cover (Fig. 54, [1]) forward onto the
side panels.
Logano GE515 - We reserve the right to make any changes due to technical modifications.
Boiler block assembly
3
2
Fig. 52 Installing the front cover
2
1
1
Fig. 53 Installing the central cover
1
2
1
Fig. 54 Installing the rear cover
8
1
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents