Installing The Control Device - Buderus Logano GE515 Installation And Maintenance Instructions Manual

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

10

Installing the control device

10 Installing the control device
This chapter explains how to install a series 4000 control
device, plus a temperature sensor set.
10.1 Installing the control device
Figure 60 shows the control unit and the front cover "A"
as viewed from the rear.
Loosen both screws (Fig. 60, [1]) securing the
terminal cover. Remove the terminal cover by pulling
it upwards.
Mount the control unit. Insert the control unit at the
front of the boiler with the locating tabs (Fig. 60, [4])
into the oval apertures of the front boiler hood
(Fig. 60, [5]). Pull the control unit forward and then
pivot it back. Ensure that the resilient hooks (Fig. 60,
[2]) engage at the rear into the rectangular apertures
of the front boiler hood (Fig. 60, [3]).
Secure the control unit base on the r.h. and l.h. side
of the cable way (Fig. 60, [6]) in the front boiler hood
with two self-tapping screws (Fig. 60, [7]).
46
Logano GE515 - We reserve the right to make any changes due to technical modifications.
1
7
6
Fig. 60 Installing the control device
2
5
4
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents