Installing the control device
10 Installing the control device
This chapter explains how to install a series 4000 control
device, plus a temperature sensor set.
10.1 Installing the control device
Figure 60 shows the control unit and the front cover "A"
as viewed from the rear.
Loosen both screws (Fig. 60, [1]) securing the
terminal cover. Remove the terminal cover by pulling
it upwards.
Mount the control unit. Insert the control unit at the
front of the boiler with the locating tabs (Fig. 60, [4])
into the oval apertures of the front boiler hood
(Fig. 60, [5]). Pull the control unit forward and then
pivot it back. Ensure that the resilient hooks (Fig. 60,
[2]) engage at the rear into the rectangular apertures
of the front boiler hood (Fig. 60, [3]).
Secure the control unit base on the r.h. and l.h. side
of the cable way (Fig. 60, [6]) in the front boiler hood
with two self-tapping screws (Fig. 60, [7]).