Buderus Logano GE515 Installation And Maintenance Instructions Manual page 64

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

14
System inspection and maintenance
Demand-dependent maintenance work
1.
System shutdown
2.
Remove and clean the hot gas baffle plates
3.
Clean the hot gas flues (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the flue gas collector
6.
Install the hot gas baffle plates
Check and, if required, replace gaskets/packing cord on
7.
burner and burner door
8.
System start-up
Final check of the maintenance work; document the
9.
measurement and test results
10.
Check the function and safety in operation
Confirm the professional maintenance with signature, date and company stamp
64
Page
(individual steps)
Page 55
Page 58
Page 58
Page 58
Page 58
Page 33
Page 50
Logano GE515 - We reserve the right to make any changes due to technical modifications.
burner documentation
burner documentation
burner documentation
Comments

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents