12.5.3 Slightly raising the flue gas temperature
Remove the Allen screw (Fig. 69, [3]) inside each hot
gas check plate and remove the l.h. and r.h. hot gas
check plates (Fig. 68, [1] and [2]).
Position the hot gas check plate onto the support, so
that the notches (Fig. 69, [1] and [2]) are hollow to
the bottom. With a hammer knock one segment each
off the l.h. and r.h. hot gas check plate.
With the Allen screw, reinstall the hot gas check plate
on the front section.
The second segment of the hot gas check plates may
be separated in the same way, if the resulting flue
gas temperature rise is insufficient; otherwise you
may remove the complete hot gas check plates as
described above.
Logano GE515 - We reserve the right to make any changes due to technical modifications.
3
Fig. 69 Hot gas check plate
System start-up
12
1
2
53