7 boiler sections
9 boiler sections
11 boiler sections
Fig. 42 Thermal insulation for various boiler sizes (dimensions in mm)
V = front (boiler front)
H = rear (rear of the boiler)
Secure the cross tie-bars at the lower front (Fig. 43,
[1]) with two hexagon screws each on the respective
boiler section feet. The edges of these tie-bars must
point outwards.
Logano GE515 - We reserve the right to make any changes due to technical modifications.
V
H
V
H
H
V
H
Boiler block assembly
8 boiler sections
8 boiler sections
V
H
V
10 boiler sections
H
V
12 boiler sections
H
1
Fig. 43 Installing the lower cross tie-bars
8
37