Hook the lateral plinth rails (Fig. 47, [1] and [3])
respectively with the long overhang forward (Fig. 47,
[2]) into the lower cross tie-bars.
Initially secure the sides of the plinth rails loosely to
the cross tie-bars using self-tapping screws.
8.9.4 Installing side panels and covers
Fit all side panels in accordance with the general
arrangement drawing (Fig. 48).
7 boiler sections
8 boiler sections
Fig. 48 Arrangement of the side panel components for various boiler sizes (dimensions in mm)
K = hinged cover (110 mm)
Logano GE515 - We reserve the right to make any changes due to technical modifications.
Fig. 47 Installing the lateral plinth rail
9 boiler sections
10 boiler sections
Boiler block assembly
3
2
11 boiler sections
12 boiler sections
8
1
39