Buderus Logano GE515 Installation And Maintenance Instructions Manual page 59

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

Slacken both self-tapping screws on the connection
plate and remove the plate.
Remove both self-tapping screws on the l.h. and r.h.
side of the boiler rear panel section.
Slightly lift the lower rear boiler panel section and
remove towards the back.
Slacken the spring hook below the flue outlet, flip the
thermal insulation upwards, and hook in using the
spring hook (Fig. 75, [1]).
Remove the clean-out cover on the rear section
(Fig. 75, [2]) and on the flue gas collector (Fig. 75,
[3]).
Remove all loose combustion residues from the
combustion chamber, the hot gas flues and the flue
gas collector.
Check the packing cord on the clean-out covers and
the burner door. Replace damaged or hardened
packing cord.
USER NOTE
You can obtain suitable packing cord from
your local Buderus sales office.
Clean the hot gas baffle plates with the cleaning
brushes.
Inserting the hot gas baffle plates into the hot gas
flues (
chapter 8.8.5 "Insert the hot gas baffle
plates", page 33).
Close the clean-out cover and the burner door.
Tighten all screws equally.
Pivot the thermal insulation on the rear section down
and draw together below the flue outlet using a spring
hook (Fig. 76, [1]).
Hook the lower rear boiler panel sections on the left
and the right into the slots of the edge of the upper
rear boiler panel and the side panel, and secure the
connecting plate below the flue outlet on the lower
boiler back panel sections.
Logano GE515 - We reserve the right to make any changes due to technical modifications.
System inspection and maintenance
3
Fig. 75 Remove the clean-out covers
Fig. 76 Draw the thermal insulation on the rear section
together
14
1
2
1
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents