Commissioning report

▶ Initial and date the commissioning steps carried out.
Commissioning steps
1.
Fill heating system and check for leaks
Heating system filling pressure
2.
Details in "Water quality requirements for Logano plus GB312"
manual taken into account
Concentration of any additives
3.
Record gas characteristics: calorific value
4.
Check gas pipe for leaks
Bleeding the gas supply pipe
5.
Bring the system up to operating pressure
6.
Check air intake and outlet openings and flue connector
7.
Checking the air inlet diaphragm
8.
Checking appliance equipment
9.
Starting up the control panel and the burner
10.
Adjust burner setting if necessary
11.
Record readings taken
Pressure differential
Flue gas temperature
Air temperature
Carbon dioxide level (CO
Carbon monoxide content (CO), free of air
12.
Measuing the gas supply pressure
13.
Checking for leaks during operation
14.
Function testing
Testing ionization current
15.
Installing jacket panels
16.
Inform operator and hand over technical documentation
17.
Correct commissioning confirmed by installer
18.
Signature of operator
Table 18 Commissioning report
Logano plus GB312 – 6 720 806 273 (2013/01)
)or oxygen content (O
)
2
2
Placing the heating system in operation
Page
Readings taken
__________________ psi
Add.:______________ Conc.:__________%
42
__________________ BTU/ft³
42
51
41
43
43
42
44
45
48
Maximum load
Minimum load
____________in W.C. ____________in W.C.
________________ °F ________________ °F
________________ °F ________________ °F
________________ % ________________ %
_____ ppm
_____ ppm
53
____________in W.C.
53
52
____________ μA
54
54
Signature:___________________________________________________