Buderus Logano GE515 Installation And Maintenance Instructions Manual page 48

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

10
Installing the control device
Secure the cable duct (Fig. 63, [1] and [2]) on the l.h.
and r.h. side to the rear of the boiler.
Provide a permanent connection acc. to EN 50165 or in
accordance with the relevant national regulations.
Make all electrical connections in accordance with
the wiring diagram. Pay particular attention to the
cable and capillary pipe runs!
USER NOTE
Secure all cable runs with cable ties.
Insert cable clips with fitted cables into the clip frame
and secure by pivoting the lever (Fig. 64, [1]).
Hook the rear wall part (Logamatic 43xx) with the
lower hooks into the clip frame and push the top part
home, until the lateral hooks engage (Fig. 61, [2]).
Fit the terminal cover (Fig. 60, [1]) with two self-
tapping screws and secure on the control unit base
(Fig. 65).
48
Logano GE515 - We reserve the right to make any changes due to technical modifications.
Fig. 63 Electrical connection
1
Fig. 64 Secure all electrical cables
Fig. 65 Boiler with installed control device
1
2
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents