Buderus Logano GE515 Installation And Maintenance Instructions Manual page 42

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

8
Boiler block assembly
Push the upper rear boiler panel underneath the rear
boiler cover (Fig. 55, [1]) and secure with four self-
tapping screws from the rear on the side panels
(Fig. 55, [2]).
Insert the snap nuts into the l.h. and r.h. side panels
and into the rear boiler panel components (Fig. 56,
[1], [3], [4] and [8]).
Hook the lower boiler panel sections on the left and
the right into the slots of the edge of the upper rear
boiler panel and the side panel (Fig. 56, [5]).
Secure the boiler rear panel components with self-
tapping screws to the side panels.
Secure the link plate (Fig. 56, [2]) below the flue
outlet on the rear boiler panel components using self-
tapping screws.
Secure the plastic cable glands either on the l.h. or
r.h. side of the upper rear boiler panel (Fig. 56, [5]
and [6]).
42
Logano GE515 - We reserve the right to make any changes due to technical modifications.
Fig. 55 Installing the upper rear boiler panel
6
5
4
3
Fig. 56 Installing rear boiler panel components
1
2
7
8
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents