6.5
Commissioning report
B Sign all commissioning work as completed and enter
the date.
Commissioning tasks
1.
Fill the heating system with water.
2.
Vent the heating system.
3.
Carry out leak testing (gas, flue gas, water).
4.
Start up the control unit.
5.
Start-up the burner.
6.
Perform a leak test on the hot gas side. After being in
operation for a short time, retighten the burner door bolts
to prevent leaks around the door as a result of the pack-
ing cord settling.
7.
Inform the system user, hand over the technical docu-
mentation, and enter the fuel used in this heating system
in the table of the operating instructions.
8.
Confirm correct commissioning.
Company stamp/signature/date
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Page (individual steps)
page 35
page 36
page 33, page 30, page 17
control unit documenta-
tion
burner documentation
6
Initial operation
Comments
(signature)
37