8
Commissioning the heating system
8.8

Commissioning report

B Sign all
commissioning work as completed and enter the
date.
Commissioning work
1. Fill heating system and check all connections for leaks
2.
Filling the siphon with water
3. Create operating pressure
– Adjust the green field on the pressure gauge
– Vent the heating system
– Adjust the pre-charge pressure of the expansion vessel
(
observe expansion vessel documentation)
4. Check the combustion air supply and flue gas routing
5. Check the location of the hot gas baffle plates
6. Start up the control unit (
7. Starting the burner (
8. Adjust the control unit settings to suit the customer's requirements
(
control unit documentation)
9. Provide the system user with information and hand over all relevant
technical documentation
Confirm professional commissioning
USER INFORMATION
B Inform your customer of the correct fuel
and enter it in the table (
rating instructions).
42
Logano GB125 oil condensing boiler - Technical specifications are subject to change without prior notice.
observe the control unit documentation)
observe burner documentation)
boiler ope-
Page Actual values
34
__________ bar
30
38
__________ bar
39
41
41
Company stamp/signature/date