9
Commissioning the heating system
9.7

Commissioning report

Sign all commissioning work as completed and enter
the relevant date.
Commissioning steps
1
Fill heating system and check all connections for leaks
.
2
Create operating pressure
.
– Adjust the green field on the pressure gauge
– Bleed the heating system
– Adjust the expansion vessel inlet pressure (
vessel documentation)
3
Check the combustion air supply and the flue gas routing
.
4
Start up the control device (
.
5
Start up the burner (
.
6
Check the flue gas temperature, and raise if
.
required
7
Check the high limit safety cut-out (STB)
.
8
Match the control device settings to the customer's requirements
.
(
control device documentation)
9
Provide the system user with information and hand over all relevant
.
technical documentation
Confirm that commissioning was carried out by a properly qualified
person
USER NOTE
Inform your customer of the correct fuel
type and enter it into the table (
operating instructions).
46
see the expansion
see the control device documentation)
see the burner documentation)
boiler
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
Page
Actual values
37
__________ bar
42
__________ bar
43
43
43
__________ °C
44
Company stamp/signature/date
Comments