Buderus Logano GE515 Installation And Maintenance Instructions Manual page 36

Oil- and gas-fired boilers
Hide thumbs Also See for Logano GE515:
Table of Contents

Advertisement

8
Boiler block assembly
Locate the longitudinal rail (Fig. 39, [1]) with the front
notch on the notch in the cross tie-bar (Fig. 39, [2]).
At the rear of the boiler, push the longitudinal rail from
below against the cross tie-bar.
Align the longitudinal rails and the mounting brackets
on the front and the rear sections (Fig. 40, [1] and
[3]) secure tightly.
Push the central mounting brackets (Fig. 40, [2])
from below against the longitudinal rails and tightly
secure on the boiler block.
8.9.3 Installing the thermal insulation
USER NOTE
Remove the longitudinal rails before
installing the thermal insulation.
The thermal insulation supplied (Fig. 41, [1])
corresponds to the respective boiler size. Arrange
the thermal insulation in accordance with the
diagram shown on drawing 42 on the boiler block (the
figures above the thermal insulation shown unfolded
correspond to the number of boiler sections).
Insert the mounting brackets through the cut-outs
into the thermal insulation.
Push the thermal insulation in the lower area under
the boiler block. The boiler section feet are set into
the cut-outs of the thermal insulation.
36
Logano GE515 - We reserve the right to make any changes due to technical modifications.
1
Fig. 39 Locating the longitudinal rail on the cross tie bar
Fig. 40 Aligning the longitudinal rails
Fig. 41 Boiler block with thermal insulation
2
1
2
3
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents