Teledyne T360 Operation Manual page 28

Carbon dioxide analyzer
Table of Contents

Advertisement

Getting Started
26
4. Inspect the interior of the instrument to make sure all circuit boards and other
components are in good shape and properly seated.
5. Check the connectors of the various internal wiring harnesses and pneumatic
hoses to make sure they are firmly and properly seated.
6. Verify that all of the optional hardware ordered with the unit has been
installed. These are listed on the paperwork accompanying the analyzer.
7. VENTILATION CLEARANCE: Whether the analyzer is set up on a bench or
installed into an instrument rack, be sure to leave sufficient ventilation
clearance.
Back of the instrument
Sides of the instrument
Above and below the instrument
Various rack mount kits are available for this analyzer – please see Section 1.3.
Teledyne API Model T360/T360M Operation Manual
AREA
MINIMUM REQUIRED CLEARANCE
4 in.
1 in.
1 in.
07272B DCN6552

Advertisement

Table of Contents
loading

This manual is also suitable for:

T360m

Table of Contents