Chrysler Sebring 2004 Service Manual page 1295

Table of Contents

Advertisement

21 - 34
T350 MANUAL TRANSAXLE
INPUT SHAFT (Continued)
(10) Install input shaft in shop press. Using bear-
ing splitter, remove 3-4 synchronizer and 3rd gear
(Fig. 98).
Fig. 98 3rd Gear Removal
1 - PRESS RAM
2 - INPUT SHAFT
3 - 3RD GEAR
4 - SYNCHRONIZER ASSEMBLY
(11) Remove 3rd gear caged needle bearing (Fig.
99). Inspect needle bearing for a broken retention
spring
Fig. 99 3rd Gear Caged Needle Bearing
1 - INPUT SHAFT
2 - 3RD GEAR CAGED NEEDLE BEARING
(12) Inspect the input shaft for worn or damaged
bearing races or chipped gear teeth. Replace as nec-
essary.
ASSEMBLY
The snap rings that are used on the input shaft
are available in select fit sizes. Use the thickest snap
ring that fits in each snap ring groove.
(1) Place input shaft into shop press.
(2) Install 3rd gear caged needle bearing (Fig.
100).
Fig. 100 3rd Gear Caged Needle Bearing
1 - INPUT SHAFT
2 - 3RD GEAR CAGED NEEDLE BEARING
(3) Install 3rd gear and 3-4 synchronizer onto
input shaft. Install Tool #C-3717 over input shaft and
press on synchronizer hub and 3rd gear (Fig. 101).
The synchronizer hub has the letter U stamped on
the top face of the hub. This designates that the hub
must be installed with the U facing upward.
Fig. 101 Press On 3rd Gear Synchronizer Hub
1 - PRESS RAM
2 - SPECIAL TOOL C-3717
3 - BEARING SPLITTER
4 - 3RD GEAR SYNCHRONIZER ASSEMBLY
(4) Install 3-4 synchronizer snap ring into slot on
input shaft.
(5) Install blocking ring into 3-4 synchronizer.
Install 4th gear caged needle bearing.
(6) Install 4th gear onto input shaft.
JR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2004Stratus 2004

Table of Contents