4 Replacement Procedures
4.7
Switch membrane
Removing the switch membrane
The following describes the procedure for removing the switch membrane (See Figure 4-12).
1. Remove the following screw and remove the LCD CONN holder.
•
2. Pull out the switch membrane from the slit and disconnect it from the connector
PJ9650 on the system board.
3. Remove the following screw fixing the membrane switch.
•
4. Slide the switch membrane to the arrow direction and remove it.
M2.5x2.8B FLAT BIND
4-24
M2.5×6B FLAT BIND screw
M2.5×2.8B
FLAT BIND screw
LCD CON holder
PJ9650
Figure 4-12 Removing the switch membrane
4.7 Switch membrane
x1
x1
M2.5x6B FLAT BIND
Switch membrane
Slit
QOSMIO E10 Maintenance Manual (960-492)