CHAPTER 5
Preparation Overview
Site Preparation Checklist for OCX1100 Switches
Table 19: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure the distance between external power
sources and the switch installation site.
Calculate the power consumption and
requirements.
Hardware Configuration
Copyright © 2017, Juniper Networks, Inc.
The checklist in
Table 19 on page 31
preparing a site for OCX1100 switch installation.
For More Information
"Environmental Requirements and
Specifications for OCX1100
Switches" on page 32
AC Power Supply Specifications
for OCX1100 Switches on page 41
DC Power Supply Specifications
for OCX1100 Switches on page 44
summarizes the tasks you need to perform when
Performed by
Date
31