Installing The Coin Changer System - VKI Technologies Eccellenza Pod Service Manual

Hide thumbs Also See for Eccellenza Pod:
Table of Contents

Advertisement

Eccellenza Pod

Installing the Coin Changer System

The Eccellenza Pod uses the "MDB–Level 3" protocol to communicate with a compatible
coin changer. VKI has thoroughly tested and validated ONLY the following coin changer for
proper operation with the Eccellenza Pod (firmware 2.2 or higher):
Coinco
®
MEI
- Cashflow 7000 Series
®
NRI
- Currenza C2
Conlux
It is highly recommended that you acquire the "Operation & Service" manuals for each
of these changers from their manufacturer. This sophisticated changer is highly
customizable and may require direct configuration through its own respective software,
which is totally independent of the Eccellenza Pod software configuration.
1. Remove the two right side top panel screws, and remove the rear panel.
2. Disconnect and remove the exhaust fan from the original rear panel and install it
onto the rear panel that accompanied the coin changer housing.
- Guardian 6000 Series, Quantum Pro, CoinPro3
®
®
- MCM5-1
Installing a Coin Changer System
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents