VKI Technologies Eccellenza Pod Service Manual page 19

Hide thumbs Also See for Eccellenza Pod:
Table of Contents

Advertisement

Eccellenza Pod
Maintenance
10. Swing the top of the panel forward and install the notch at the top of the panel
onto the upper post on the right wall of the machine.
11. Secure the left side of the front panel to the machine using two screws.
12. Connect the front panel wiring.
13. Install the top panel and the waste bin.
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents