VKI Technologies Eccellenza Pod Service Manual page 41

Hide thumbs Also See for Eccellenza Pod:
Table of Contents

Advertisement

Eccellenza Pod
11. Connect the wiring onto the outlet valves
a) White pair ► Powder Valve
b) Yellow pair ► Hot Water Valve
12. Connect the wiring to the three water level probes, install the temperature probe,
and connect the water pump tube to the barbed elbow on top of the water tank.
13. Turn on the water supply, connect the service cord to the wall outlet and switch on
the machine power.
14. Allow the water tank to fill and check for leaks.
15. Test the machine to make certain everything is functioning properly.
16. Install the rear panel and the top panel.
Replacing Components
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents