Removing High Pressure Switch And Pressure Switch For Control; Opening Electrical Box (P-Mounting Plate) - Hitachi RAS-2-HVNP Service Manual

Utopia ivx premium / ivx standard h(v)n(p/c)(e) series
Table of Contents

Advertisement

10. Servicing
10.4.2.8 Removing High pressure switch and pressure switch for control
1  Remove the service cover following
2  Collect the refrigerant from the check joint according to
3  Disconnect the Faston Terminals of High Pressure Switch and Pressure sensor for PD control.
4  Remove the high pressure switch and the pressure switch for control from the brazed part of discharge piping.
Pressure sensor
for control
Brazing part
10.4.2.9 Opening electrical box (P-Mounting Plate)
1  Remove the service cover following
2  Remove 6 screws which fix the electrical box and open the P plate turning counter clockwise approximately 90°.
Check that the LED201 (red) on the inverter PCB (PCB2) is OFF when opening P-mounting plate.
D A N G E R
DO NOT touch electrical components while the LED201 (Red) or LED1 (Red) are ON to avoid electrical shock. Wait
until the LEDs turn off.
415
SMGB0079 rev.0 - 01/2013
Removing service cover
Removing the
High pressure
switch
Brazing part
Discharge pipe
Removing service cover
Power plate
2 fixing
screws
in this chapter.
compressor, in this chapter.
in this chapter.
Upper cover
2 fixing
screws
2 fixing
screws
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents