2. Unit Installation
2.3 Center of gravity
Hanging Method
When hanging the unit ensure the balance of the unit check safety and lift it up smoothly. Do not remove any packing
materials and hang the unit under packing condition with two ropes as shown below. At leat two persons are needed to
move the unit.
RAS-(2-2.5)HVNP
RAS-3HVNC
RAS-3HVNPE
RAS-(4-6)H(V)NCE
RAS-(4-6)H(V)NPE
RAS-8HNPE
RAS-8HNCE
RAS-10HNPE
RAS-10HNCE
RAS-12HNP
RAS-12HNC
1
Center of gravity
16
SMGB0079 rev.0 - 01/2013
a. 515 mm
b. 180 mm
h. 275 mm
a. 600 mm
b. 195 mm
h. 370 mm
For 4 HP:
a. 590 mm
b. 180 mm
h. 360 mm
For 5-6 HP:
a. 600 mm
b. 195 mm
h. 370 mm
a. 613 mm
b. 190 mm
h. 590 mm
a. 610 mm
b. 195 mm
h. 570 mm
a. 615 mm
b. 190 mm
h. 560 mm
a. 610 mm
b. 195 mm
h. 565 mm
a. 660 mm
b. 200 mm
h. 680 mm
1
1
1
1