Screen Creation; Project Creation - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

4.2 Screen creation

4.2.1

Project creation

Projects comprise all the data and settings displayed in one GOT.
The screens displayed in the GOT and connection method with the PLC are set in a
project wizard.
In this section, the settings for the type of GOT used for training and the type of PLC
connected to the GOT are described.
1)
Click [Start] → [All Programs] → [MELSOFT
Application] → [GT Simulator2] menus to run
1)
GT Designer2.
2)
The screen on the left is displayed when GT
Simulator2 is started.
2)
Click the New button.
3)
The initial screen of the Start New Project
Wizard is displayed. (When no new wizard
appears, go to section 4.2.2.)
Click the Next button.
3)
Various settings that can be made on the project
wizard are described on the following pages.
4 - 2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents