Mitsubishi Electric Got 1000 Training Manual page 11

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

System Configuration in this Textbook
CPU module
Power supply module
QCPU
(CPU
Q61P-A1
No. 1)
Extension cable
GT15-QC12B
Bus connection unit
GT15-75QBUSL
GT1585-STBA
USB cable
GT09-C20USB-5P
PC
The PLC can also be monitored by
GX Developer or any other relevant
software via direct connection between
the PC and the PLC through an
RS-232 cable.
Output module
Input module
*
QX
QY
Q64
QCPU
(CPU
42
42P
No. 2)
(64
(64
points)
points)
points)
X0
Y40
to
to
X3F
Y7F
Y40
Y60
Y70
Y78
X20 to
X0
to
X8
to
Base unit Q3 B
A multiple CPU version of the Q series training machines is
composed of two CPUs.
Parameters need to be set in GX Developer to enable multiple
CPUs to operate. Set paramters by following the procedures
described below to write to both No. 1 and No. 2 of QCPU.
Q62
<Caution: The following settings are not required unless
AD
DA
a multiple CPU system is used.>
(16
(16
<Setting procedure>
points)
1) Doubleclick [PLC parameter] from the project list
in GX Developer.
2) When the Qn (H) parameter setting appears, click the multiple
CPU setting button.
3) Set "the number of CPUs" to "2" in the multiple CPU
setting dialog box.
4) Click the setting completed button.
BCD digital display (four digits x 2)
Y5C
to
Y5F
to
Y5F
Y6F
to
LED x 8
Y77
to
Y77 Y76
LED x 8
to
Y7F
Y7F Y7E
BCD digital switch (four digits x 2)
X3F
X7
XF
(7)
I/O panel
Y58
Y54
Y50
Y4C
to
to
to
to
Y5B
Y57
Y53
Y4F
BCD digital display
Y6C
Y68
Y64
Y60
to
to
to
to
Y6F
Y6B
Y67
Y63
Y75
Y74 Y73 Y72 Y71 Y70
Y7D
Y7C Y7B Y7A Y79 Y78
8
8
8
8
8
8
X3C X38 X34 X30
X2C
to
to
to
to
to
X3F X3B X37
X33
X2F
Snap switch (x 8)
X7
X6
X5
X4
X3
Snap switch (x 8)
XF
XE
XD
XC
XB
Y48
Y44
Y40
to
to
to
Y4B
Y47
Y43
8
8
X28
X24
X20
to
to
to
X2B
X27
X23
X2
X1
X0
XA
X9
X8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents