Os Installation - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

4.3.4

OS installation

2)
3)
This section explains operations for installing the communication driver and OS in the
GOT as preparation before monitoring.
This section explains with an example.
Point
The GOT does not include the monitor OS for monitoring or the driver for
communication.
Therefore, it is necessary to perform this operation only once before the first
monitoring.
It is not necessary after the first time. However, when the OS is updated or the
communication method is changed, this operation is required. (Installation is
completed on the training machine, so overwriting is necessary.)
(Next page)
1)
Click on the [Communication] – [To/From
GOT] menu.
2)
When the dialog box appears, click the [OS
installation → GOT] tab.
3)
Select the standard monitor OS.
The standard monitor OS is a program that
performs monitor function control.
4)
Select the communication driver.
The
communication
communication between the GOT and the
PLC CPU.
Select
corresponding to the connection type.
Check the "Q BUS" in the "BUS/network
Group" of the "communication driver".
5)
Click the Install button.
4 - 20
driver
the
communication
performs
driver

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents