Executing The Monitor - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

4.6

Executing the monitor

Displays the value of D100.
Adds to the value of D100.
Sets the value of D100 to
the number displayed on
the switch.
Displays errors and
error codes when
a malfunction occurs
in GOT or CPU.
Operate the screen downloaded to the GOT, and monitor the PLC.
GOT Operation Image
(1) Monitoring/changing the bit device (X0, X1) values
1)
When the Y71 ON switch is touched, the Y71
comes ON.
2)
When the Y71 OFF switch is touched, the Y71
goes OFF.
2)
1)
3)
Each time the Y70 ON/OFF switch is touched,
the Y70 goes ON/OFF.
3)
4 - 30
Lamp is lit when
Y70 is turned ON.
Lamp is lit when
Y71 is turned ON.
Turn Y71 OFF.
Turn Y71 ON.
Switches Y70
ON or OFF
each time Y70 is
touched.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents