Mitsubishi Electric Got 1000 Training Manual page 176

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

(From previous page)
6)
3), 4)
3)
5)
7)
3)
Set [Connection Setup].
PC side I/F: Serial USB
PLC side I/F: PLC module
Other station: No specification
4)
Double-click [CPU module] of PLC side I/F to
display [PLC side I/F Detailed setting of PLC
module].
8)
5)
Check [via GOT(Bus) transparent mode] in
[PLC side I/F Detailed setting of CPU module],
and click the OK button.
Check
transparent mode] when connecting PC and
GOT with the RS-232 cable.
6)
Go back to [Connection Setup], double-click
[Serial USB] of PC side I/F to display [PC side
I/F Serial Setting].
7)
Check [USB] in [PC side I/F Serial Setting]
and click the OK button.
8)
Go back to [Connection Setup], click the
Connection test button, and check that the
connection to QCPU is established.
Appendix 22
[via
GOT
(direct
connection)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents