Routing Power And Data Cables To Fixed Drives - Gateway 9510 User Manual

Gateway 9510 server
Table of Contents

Advertisement

Chapter 4: Installing Components
10
Remove the drive rails from the old drive, then attach the rails to the new drive by
pressing the rails firmly into the side dimples on the drive.
11
Set any jumpers on the new drive. See the drive's documentation for further
instructions.
12
Slide the new drive into the drive bay until the drive rails snap into place.
13
Connect the drive cables by following the instructions in
cables to fixed drives" on page
documentation.
14
Follow the instructions on
15
Follow the instructions in

Routing power and data cables to fixed drives

To route power and data cables to fixed drives:
1
Follow the instructions in
2
Follow the instructions in
3
Follow the instructions in
56
56. For more information, see the drive's
"Installing the bezel assembly" on page
"Closing the server case" on page
"Preventing static electricity discharge" on page
"Opening the server case" on page
"Removing the bezel assembly" on page
www.gateway.com
To 4-drive
bay
"Routing power and data
49.
52.
41.
42.
44.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents