Gateway 9510 User Manual page 93

Gateway 9510 server
Table of Contents

Advertisement

Chapter 4: Installing Components
10
Loosen the two mounting screws that secure the backplane to the hot-swap cage.
Mounting screw
11
Slide the backplane to the right slightly to disengage it from the retainer posts, then
pull it away from the hot-swap cage.
12
Place the new backplane onto the retainer posts of the hot-swap cage, with the drive
connectors to the inside of the cage, then slide the backplane to the left to align the
mounting holes.
13
Tighten the mounting screws to secure the backplane to the drive cage.
14
Slide the hot-swap cage part-way into the hot-swap bay. Make sure that the side of
the cage marked "Top" is oriented toward the top of the server case.
15
Connect the power, data, and manageability cables to the backplane.
16
Slide the hot-swap cage all the way into the hot-swap bay until the hot-swap bay latch
clicks into place.
17
Replace the hot-swap fan, if removed. For instructions, see
on page
92.
18
Install each of the drives into the hot-swap cage. Make sure that you replace the drives
in the correct order by referring to your notes from
88
Retainer post
Retainer post
Retainer post
www.gateway.com
Retainer post
Mounting screw
"Replacing a hot-swap fan"
Step
5.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents