648 Port InfiniBand QDR Switch Platform User Manual
Container screws
3.
Remove and put aside the box containing the cables.
4.
Remove and put aside the box containing the cable management kit.
5.
Remove and put aside the box containing the Installation kit.
6.
Visually inspect the chassis, make sure that:
there is no visible damage
all 18 spines are installed
10 PSUs are installed
all 8 fans are installed
1 management module is installed
7.
Remove all protective plastic film from all sides and top of the chassis.
Mellanox Technologies
Figure 3: Container Screws
The leafs, spines, and management modules are shipped separately.
Do not remove any of the blocks or either of the lock-down bars at this time.